2016-01-13 - 24113 - Break fix - Maintain ISO code for UOM Yard in SNC and ECC Systems #ProductionBreakFix #sncsup
2016-01-13 - 24113 - Break Fix - ISO Code for Yard in SNC and ECC
Problem Summary
Add ISO Code for UOM Yard in SNC and ECC.
Admin Info
Purpose
|
Add ISO Code for UOM Yard in ECC & SNC
|
Requested by
|
Bhumi Bhagat
|
Issue Date
|
01/13/2016
|
Resolved by
|
Adithya
|
Resolved Date
|
01/20/2016
|
Document Status
|
Complete
|
Detailed Problem Description
(Include Screen Shots if required )
A PO "4500149935 " is created with UOM Yard for which ISO code is not maintained in ECC and SNC systems, hence the POs is not moved to SNP
Solution Analysis and Recommendations
(Include Screen Shots if required)
Maintain ISO Code for UOM Yard in both ECC and SNC systems and move the PO to SNP.
It is observed that the in ECC Development and Quality Production systems are different.
In DEV the ISO Details are already filled in for UOM Yards. But if we look at the Production System we do not see that:
Development NED 100
Production NEP 100
Checked if there are any transports open on which this configuration might have done in DEV and not moved to QAS or Production systems.
Would you like us to remove and update the ISO Code YRD and create a new one?
S.No
|
Test Scenario
|
Expected Result
|
1
|
Create a PO with Yard UOM and try to move the PO
|
The PO must to moved to SNC system
|
Resolution
Move the TR for the change adding the ISO code for yard in ECC and SNC and move the PO.
Remove the ISO Code which is already there in the NED 100 and again update and create a transport to move it to Quality and Production systems.
Also update the ISO Code in the Yard UOM in SND 100 and create the transport to move it to SNQ & SNP.
Release Information
Provide link here to Release Notes if Technical Objects were changed
2016-01-20 - 24113 - Rel Notes - Add ISO code of yard in SAP (Bhumi by 2016-01-20)